NRC names new resident inspector at VY

By, Josh Stilts
Monday November 29, 2010

BRATTLEBORO — The Vermont Yankee nuclear power plant will have a fresh set of eyes to inspect the plant. Sarah Rich was selected as the new Nuclear Regulatory Commission resident inspector for the nuclear plant in Vernon filling a vacancy left by previous inspector Heather Jones, who is taking a new position within the NRC. Rich joined the NRC in August 2008 after earning a bachelor’s degree in nuclear science and engineering from the Massachusetts Institute of Technology. “Sarah Rich’s education, training and commitment to safety will help the NRC in its mission of protecting people and the environment by helping ensure that Vermont Yankee meets the high standards set by the agency,” NRC Region I Administrator Bill Dean said.

full article – http://www.reformer.com/localnews/ci_16730825

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s